Skip to the story

Business Foundations

How to Price Commercial Cleaning Jobs Profitably

From walkthrough to monthly price, with every step of the arithmetic and a worksheet to check your own bid.

A teal ride-on floor sweeper with two round side brushes, seen from the front on a light gray wood-look floor against a plain pale wall.
Equipment is one of the cost lines a monthly price has to carry. Photo by giyofloor floor machine on Unsplash (opens in a new tab)
In this article
  1. Why a borrowed rate is a risk
  2. Measure the job: space, time and frequency
  3. What an hour of labor really costs
  4. Supplies, equipment, travel and the rest of the direct costs
  5. Overhead per hour, and why a small company's rate is higher
  6. Margin and markup are different measures
  7. One building, priced start to finish
  8. Hourly, per visit, per square foot or flat monthly
  9. How frequency changes the price
  10. When the price breaks
  11. Mistakes that underprice a bid
  12. Wage changes, renewals and government work
  13. The commercial cleaning pricing worksheet
  14. Next steps
  15. Sources

Picture an owner walking a 12,000-square-foot office for the first time. The property manager mentions that the building has been paying about ten cents a square foot, and the owner, wanting the account and not wanting to look greedy, writes a quote at that rate. Ten cents sounds modest. Whether it covers the work depends on a word nobody said aloud: ten cents a square foot per what? For a building cleaned twice a week, a price per visit, per week and per month differ by a factor of two to nearly nine, and only one reading pays the crew.

This article is about how to price commercial cleaning jobs so that the price covers the real cost of the work and leaves a margin you chose on purpose. It builds a monthly price from the bottom up: the building, the hours the building takes, the true cost of those hours, the supplies and equipment that go with them, a fair share of the company's overhead, and a margin. Then it tests the price against the ways it can fail. The arithmetic is shown in full, and a worksheet at the end lets you run your own building through the same steps.

Three things to know before starting. Every dollar figure in the worked examples is a hypothetical assumption, chosen to be easy to follow and easy to replace. No source cited here publishes a rate card, and this article does not either. And pricing is one half of the work; the other half is finding buildings to price, which our guide to how to start a cleaning business and its companion pieces cover. Where this article overlaps the pricing section of that guide, it goes deeper instead of repeating it.

Why a borrowed rate is a risk

Owners look for rates because a price is hard to build from nothing. The best-known public range from the trade is in a Building Service Contractors Association International (BSCAI) article of bidding tips, which says average rates for commercial cleaning can range from $0.05 to $0.25 per square foot and links a Chron.com small-business article for the figure. The same piece illustrates the method with 7,000 cleanable square feet at $0.20, which gives a $1,400 estimate (BSCAI).

Read carefully, the article never says what period the rate covers. It does not say whether $1,400 is the price of one visit, one week or one month. We read this as an ambiguity in a short tips article published in February 2020. It matters because the unit changes the answer. The worked job later in this article, a 10,500-cleanable-square-foot office cleaned twice a week, has a monthly price of about $0.19 per square foot and a per-visit price of about $0.02 per square foot. Both figures describe the same price. The first falls inside BSCAI's range and the second sits below it, and a reader who borrows the range without knowing its period can talk themselves into either number.

Rates also carry no information about your own costs. A crew that cleans 2,500 square feet an hour and a crew that cleans 1,500 face very different prices for the same floor plan. A company paying $14 an hour and one paying $19 do too. A rate tells you what someone else charged for some building under some terms. It cannot tell you whether your price covers your cost, so it is useful only as a late sanity check, after the price has been built from your own numbers.

That is the approach below. BSCAI's own advice points the same way: it describes a completed bid as the framework and budget for the services provided, and says that if a new account's gross margin falls short of what you projected for overhead and profit, the likely cause is an error in the cost estimates made during the bid (BSCAI).

Measure the job: space, time and frequency

A price starts with hours, and hours start with a count of what is actually cleaned. BSCAI's tips say to take the building's total square footage and subtract the non-cleaning areas. In the example office, a server room, storage and mechanical space are the areas left out: 12,000 total square feet minus 1,500 of non-cleaned space leaves 10,500 cleanable square feet.

The next number is the production rate, the area a crew can clean in an hour. BSCAI separates task-specific rates, such as the minute it takes to empty one trash can, from comprehensive rates that cover the whole facility. Its worked example is a 25,000-square-foot medical facility where a crew spends 10 hours on the nightly duties, which is a rate of 2,500 square feet per labor hour for that building. The article says the rate may be applied to a similar facility with a similar scope and density, and lists what moves it: the scope of work, how often each task is done, the days of service, the type of facility and how many people use it (BSCAI). It names the ISSA Cleaning Times as a benchmark source and also recommends conducting your own time and motion studies.

We use 2,000 square feet per labor hour in the examples below. That figure is a placeholder we picked so the arithmetic is easy to follow. It is not a benchmark, and BSCAI's 2,500 describes one medical building, not an industry average. We did not use the ISSA tables, and no rate from them appears here.

Time your own crews

The honest way to get a production rate is to measure it. A simple method, which is our suggestion rather than a published procedure, is to clock a real crew doing a real nightly scope in a building you already clean, or in one you clean as a trial, and to record the result for several visits instead of one. Log the start and end time, the cleanable area, the number of people, what was done, and anything that slowed the crew. Divide the area by the person-hours. Keep results by building type, because an open-plan office, a row of small offices and a clinic with many restrooms will give different numbers.

Production-rate time trial log
Building: [name or code]            Type: [open office / private offices / clinic / retail / other]
Cleanable area: [sq ft]             Date: [date]
Scope done tonight: [tasks, in order]
People on crew: [number]            Start: [time]   End: [time]
Person-hours: [people x hours worked, excluding breaks]
Time before and after the cleaning itself (setup, alarm, lock-up): [minutes]
Production rate: [cleanable sq ft / person-hours of cleaning only]
Anything unusual (events, full trash, spills, a late tenant): [notes]
Use this visit in the average? [yes / no, and why]

Two kinds of time sit outside the production rate. The first is fixed time on every visit: moving equipment, arming and disarming the alarm, locking up, walking between zones. BSCAI's work-loading article names equipment storage and building-security duties such as alarm arming and door locking as items to plan, and says crews should avoid wasting time going back and forth between the area they are serving and their equipment closet (BSCAI). The amount of fixed time per visit is yours to measure, and the example below assumes half an hour. The second kind is periodic work, which BSCAI says to include in the final workload: it lists monthly burnishing and annual carpet or window cleaning as examples. The work-loading article adds that infrequent work may be done by the regular crew or by a specialty crew, in which case you must also plan the crew's equipment and travel. The example assumes four hours a month of periodic floor work and two hours a month of supervision, both of which we chose.

Frequency turns visits into months

Contracts are usually priced by the month while crews work by the visit, so convert with the number of visits in an average month: visits per week times 52, divided by 12. Twice a week is 2 × 52 ÷ 12 = 8.67 visits a month. Carry the decimals through the calculation and round only the results; rounding the 8.67 early shifts the totals by a few dollars.

What an hour of labor really costs

Labor is the largest line. BSCAI puts it at roughly 50 to 80 percent of the total price in commercial cleaning (BSCAI), so a small error in wage cost or hours moves the whole price. The wage is only the first piece. On top of it sits the labor burden, the employer's cost of having an employee. BSCAI lists the mandatory items as payroll taxes, workers' compensation and general liability insurance. Paid leave and benefits beyond what the law requires are a company's choice. Building the burden from named pieces is better than borrowing a percentage, because it shows which parts are known and which are guesses.

Piece of burden Share of wages in the example Status
Employer Social Security and Medicare 7.65% Rates from the IRS: 6.2% plus 1.45% (Publication 15, 2026). Social Security applies up to a wage base of $184,500, far above a cleaner's pay
Unemployment taxes (federal and state) 2.00% Assumed. The federal piece is small: the IRS describes a 6.0% FUTA rate on the first $7,000 of each employee's wages, usually reduced by a 5.4% credit to 0.6%, or $42 per employee per year. State unemployment tax rates and wage bases vary, so use your state agency's notice
Workers' compensation 5.50% Assumed. Rates depend on your state and your classification code; get a quote from a licensed agent
Paid leave and other benefits 2.00% Assumed. Lower if you offer none and your state or city requires none, higher if you offer more
Total burden 17.15% Sum of the four rows

The example wage is $16.50 an hour. That is an assumption. The Bureau of Labor Statistics (BLS) reported a national median of $17.71 an hour for janitors and building cleaners in May 2025, a figure that mixes every state and city and says nothing about yours (BLS). Check your local minimum: the Department of Labor (DOL) shows a $7.25 federal minimum, notes that many states set higher ones, and says some local governments set rates above their state's, which its state table does not display (DOL). The loaded cost of an hour at $16.50 with a 17.15 percent burden is $16.50 × 1.1715 = $19.33.

Overtime belongs in the same thought. The DOL states that covered, non-exempt employees must receive time and a half for hours over 40 in a workweek, and that averaging hours across two or more weeks is not permitted (DOL). When a customer adds visits, check whether the added hours push anyone past 40 in a single week before agreeing to the old price. All of this is general information, not legal or tax advice. Your accountant and your state labor agency are the right places to confirm payroll and wage rules.

Supplies, equipment, travel and the rest of the direct costs

Direct costs are the ones that would disappear if the account did. BSCAI suggests estimating supplies as a percentage of labor cost or as a fixed cost per labor hour, amortizing large equipment over its expected useful life, and remembering the other direct costs it lists: software, recruiting, background checks, vehicles and uniforms, performance bonds and subcontracted services (BSCAI).

The example uses three of these. Supplies are assumed at $1.30 per cleaning labor hour. Equipment is assumed at $1,260 of machines and carts that this account needs, spread over 36 months, which is $35 a month. Travel is assumed at $6 per visit for fuel and wear between sites. These are placeholders, and the useful habit is to replace each with a record: the supplies you actually bought for a building last month, the invoice for the machine, the mileage log. If a customer wants restroom paper and soap supplied, decide whose cost that is before pricing and write it into the scope, because it can be a large and uneven line.

Overhead per hour, and why a small company's rate is higher

Overhead is the cost of running the company that no single account causes: insurance beyond workers' compensation, accounting, software, a phone, the owner's administrative and sales time. BSCAI's tips suggest adding 10 to 20 percent for overhead, which is a quick method. A per-hour method is easier to defend, because it shows what happens as the company grows.

Take the company's monthly overhead and divide it by the paid labor hours it expects to bill in a month. The example assumes $2,100 a month of overhead and 300 billable hours, which is $7.00 an hour. If the company grows to 450 billable hours with the same overhead, the rate falls to $4.67 an hour. For our 55.83-hour account, that is the difference between $390.83 of overhead and $260.56, which moves the price from $1,984.22 to $1,825.35. A newer company with fewer hours carries more overhead per hour, so a competitor's price may sit below your cost while being perfectly healthy for the competitor. This is a reason to know your own number, and a warning against matching theirs.

Margin and markup are different measures

BSCAI defines a margin as the profit percentage relative to the total sales price and a markup as the percentage added to the actual cost. It says typical margins in commercial cleaning can vary anywhere from 8 to 30 percent depending on contract size, complexity and competition. The target is yours to set for each account.

Because margin is a share of the price, the price is cost divided by one minus the margin. Adding a percentage to cost gives a different, lower margin. The mapping is margin ÷ (1 − margin):

Target margin (share of price) Markup on cost needed
8% 8.70%
15% 17.65%
18% 21.95%
20% 25.00%
30% 42.86%

In the example, the total cost comes to $1,627.06 a month. Marking that up by 18 percent gives $1,919.93, whose margin is only 15.25 percent. The price that delivers an 18 percent margin is $1,984.22. The gap is $64.29 a month, or $771.47 a year, on one small account. Owners who think in markup and quote in markup quietly give away a few points of margin on each bid.

One building, priced start to finish

Here is the full build for one hypothetical building, using the steps above.

Step Calculation Result
Production hours per visit 10,500 ÷ 2,000 5.25 hours
Labor hours per visit 5.25 + 0.5 fixed time 5.75 hours
Visits per month 2 × 52 ÷ 12 8.67
Cleaning labor hours per month 5.75 × 8.67 + 4 periodic 53.83 hours
Paid hours per month 53.83 + 2 supervision 55.83 hours
Wages 55.83 × $16.50 $921.25
Labor burden $921.25 × 17.15% $157.99
Supplies 53.83 × $1.30 $69.98
Equipment $1,260 ÷ 36 months $35.00
Travel 8.67 visits × $6 $52.00
Direct cost Sum of the five lines above $1,236.23
Overhead 55.83 × $7.00 $390.83
Total cost Direct cost + overhead $1,627.06
Minimum price at an 18% margin $1,627.06 ÷ (1 − 0.18) $1,984.22

Lines are rounded to the cent while the calculation carries full precision, so a column can differ from its total by a cent. We rounded the price up to a quote of $1,985, which yields a margin of 18.03 percent and a monthly profit of about $357.94. Over a year, that is $23,820 of revenue and roughly $4,295 of profit before the owner's own pay, if the estimate holds. Treat the cents as precision the estimate does not have, and quote a round figure.

Two checks catch many errors. Labor (wages plus burden) is $1,079.24 of the $1,985 price, about 54 percent, inside BSCAI's 50 to 80 percent range. Treat that range as a prompt for a second look. And the margin computed from the quote, (price − cost) ÷ price, must match the margin you targeted.

Hourly, per visit, per square foot or flat monthly

The same $1,985 can be stated four ways, and each fits a different situation.

Model The same price stated this way Where it fits What can go wrong
Hourly $35.55 per paid hour Uncertain scope, a trial month, work whose size is hard to see on a walkthrough The customer pays for your slowness and watches the clock; efficiency lowers your revenue
Per visit $229.04 per visit Visit counts that change from month to month Your monthly cost stays the same when the customer skips a visit
Per square foot $0.0218 per visit, or $0.1890 per month Comparing quotes, explaining a price Ignores density, restrooms and layout; the period must always be written next to the number
Flat monthly $1,985 a month Stable scope and frequency, simple invoicing Scope creep and hour overruns come out of your margin

Whatever the model, build the price from cost first and then express it in the form the customer prefers. A flat monthly price is only as sound as the scope that defines it, so write the tasks, frequency and exclusions down; the companion articles on bidding and on contracts and service agreements cover how to present the price and which terms to put around it.

How frequency changes the price

Because some lines do not grow with visits, the price per visit falls as frequency rises. In the same building, with periodic work, supervision and equipment held at their example values:

Visits per week Visits per month Cleaning hours per month Monthly price at an 18% margin Price per visit
1 4.33 28.92 $1,112.95 $256.83
2 8.67 53.83 $1,984.22 $228.95
3 13.00 78.75 $2,855.49 $219.65
5 21.67 128.58 $4,598.03 $212.22

The discount per visit is small and comes from the fixed lines, not from a rule of thumb. Offering a discount for more visits without recomputing is how a bigger contract ends up with a smaller margin.

When the price breaks

A price is built on assumptions, and the useful question is how fast it falls apart when one of them is wrong. The tests below hold the quote at $1,985 and, in the hours tests, hold overhead dollars constant, because most overhead does not rise when one crew works longer.

Change New monthly cost Margin at a $1,985 price Price that restores 18%
None (the example) $1,627.06 18.03% $1,984.22
Wage rises $1.50 to $18.00 $1,725.17 13.09% $2,103.87
Every paid hour runs 10% longer than estimated $1,741.98 12.24% $2,124.37
Both of the above $1,849.91 6.81% $2,255.99

A $1.50 raise cuts the margin by about five points, and a 10 percent hours overrun cuts it by almost six. Together they leave less than seven percent. A contract with no way to pass on wage increases carries this risk for its whole term. The production rate drives the same risk through hours:

Production rate, sq ft per labor hour Cleaning hours per month Price the worksheet gives (overhead at $7.00 per paid hour) Margin if you quoted $1,985 and the crew runs at this rate (overhead dollars unchanged)
1,500 69.00 $2,495.26 2.27%
1,750 60.33 $2,203.24 11.28%
2,000 53.83 $1,984.22 18.03%
2,250 48.78 $1,813.87 23.29%
2,500 44.73 $1,677.60 27.49%

This table is the reason to time your crews. The difference between a crew that runs at 1,500 square feet an hour and one that runs at 2,500 is $817.66 of monthly price for the same floor plan, and a bid written at the wrong end quietly loses most of its margin or loses the account. Wage differences matter as well: re-running the example at $14 an hour gives $1,784.80, and at $19 gives $2,183.64.

Scope creep works the same way. In the example, one extra visit a month at no charge costs about $124.62 in wages, burden, supplies and travel, before any overhead, which is roughly a third of the account's monthly profit.

Mistakes that underprice a bid

A few errors recur in this kind of work, and each is visible in the arithmetic above.

The borrowed rate is the second. Applying $0.10 per square foot per month to the example would produce a price of $1,050, which is $577.06 below cost before any profit. Reading BSCAI's range as per visit instead of per month would suggest $525 to $2,625 for every visit, or $4,550 to $22,750 a month at 8.67 visits, a spread too wide to price any one building. The period is the difference, and the only reliable way through is to build from cost.

Other repeated mistakes: forgetting fixed time, so that a crew that cleans fast still spends the first half hour on setup; leaving periodic tasks out of the monthly hours; ignoring drive time between buildings when a crew serves more than one site a night; and discovering after the first month that the customer expected restroom supplies to be included. BSCAI's questions for a bid system, which include how many people must be hired, what they will be paid, how many hours they will work and how much profit the account will make, are a decent checklist for catching these before the quote goes out.

Wage changes, renewals and government work

Two events regularly reset a price: a wage increase and a renewal. If wages rise during a contract and nothing in the agreement lets you adjust, the margin falls as in the table above. Many agreements handle this with a price-adjustment or escalator clause or with a defined renewal date at which prices are reviewed. The wording of such a clause is legal drafting. Have an attorney review your template, and see our companion article on contracts and service agreements for the structure of the terms. At renewal, recompute the margin from current wages and actual hours before the customer's renewal notice arrives, so the conversation starts from numbers.

Work for the federal government follows other rules. The DOL says the Service Contract Act applies to federal service contracts in excess of $2,500, that the wage determination in the contract sets the required wages and fringe benefits, and that a successor contractor must pay at least what the predecessor's collective bargaining agreement required for the first year (DOL). If you bid such work, the contract's wage determination replaces the wage and benefit assumptions in this article. Read it first. Confirm current terms with the contracting officer or the DOL before pricing.

The commercial cleaning pricing worksheet

The worksheet below collects the steps in order. Copy it into a spreadsheet, put your own number in each input row, and let the calculated rows follow. The "Example" column shows the values from the office above. This worksheet is the Journal's own approach, assembled from the cost categories BSCAI describes. It is not a published standard or an industry benchmark.

A. The site

Row Item How to fill it Example
A1 Total square feet From the walkthrough 12,000
A2 Square feet that are not cleaned Server rooms, closets, storage 1,500
A3 Cleanable square feet A1 − A2 10,500

B. Frequency and time

Row Item How to fill it Example
B1 Visits per week From the scope 2
B2 Visits per month B1 × 52 ÷ 12 8.67
B3 Production rate, sq ft per labor hour From your own time trials; note the source 2,000
B4 Production hours per visit A3 ÷ B3 5.25
B5 Fixed time per visit Setup, alarm, lock-up, moving equipment 0.5
B6 Cleaning hours per visit B4 + B5 5.75
B7 Periodic hours per month Floors, carpet, windows, divided over months 4
B8 Cleaning hours per month B6 × B2 + B7 53.83
B9 Supervision and inspection hours per month Your estimate 2
B10 Paid hours per month B8 + B9 55.83

C. Labor cost

Row Item How to fill it Example
C1 Hourly wage Check the local minimum $16.50
C2 Burden: Social Security and Medicare 7.65% 7.65%
C3 Burden: unemployment taxes State and federal; your notices 2.00%
C4 Burden: workers' compensation Agent's quote for your class code 5.50%
C5 Burden: leave and benefits Your policy 2.00%
C6 Total burden C2 + C3 + C4 + C5 17.15%
C7 Loaded cost per hour C1 × (1 + C6) $19.33
C8 Monthly labor cost B10 × C7 $1,079.24

D. Other direct costs

Row Item How to fill it Example
D1 Supplies B8 × cost per labor hour, from records $69.98
D2 Equipment per month Cost ÷ months of useful life $35.00
D3 Travel per month Per visit cost × B2 $52.00
D4 Other: uniforms, software, screening, bonds, subcontractors Itemize $0.00
D5 Direct cost C8 + D1 + D2 + D3 + D4 $1,236.23

E. Overhead and price

Row Item How to fill it Example
E1 Company overhead per month Insurance, accounting, software, admin $2,100
E2 Paid hours the company bills per month Company-wide estimate 300
E3 Overhead per paid hour E1 ÷ E2 $7.00
E4 Overhead for this account E3 × B10 $390.83
E5 Total cost D5 + E4 $1,627.06
E6 Target margin Share of price; your decision 18%
E7 Minimum monthly price E5 ÷ (1 − E6) $1,984.22
E8 Equivalent markup on cost E6 ÷ (1 − E6) 21.95%
E9 Price per visit E7 ÷ B2 $228.95

F. Checks and stress tests

Row Item How to fill it Example
F1 Labor share of price C8 ÷ E7; look again if outside 50 to 80% 54.39%
F2 Price per cleanable sq ft, per visit and per month E9 ÷ A3; E7 ÷ A3 $0.0218; $0.1890
F3 Margin check (E7 − E5) ÷ E7 should equal E6 18.00%
F4 Wage up $1.50: new cost and margin at your quote Recompute C7 through E5 $1,725.17; 13.09%
F5 Hours up 10%: new cost and margin at your quote Recompute with overhead dollars unchanged $1,741.98; 12.24%
F6 Your quoted price Rounded; never below E7 $1,985
F7 Walk-away price E7 $1,984.22
F8 Notes Exclusions, who supplies restroom paper, wage-adjustment clause, payment terms

Use it in this order. Fill sections A and B at the walkthrough, with a tape measure and the site-survey sheet. Do not enter the production rate from memory. Complete C and D from your payroll quote and your supply records, and E from your company's books. Then read F before sending anything. If the stress tests leave a margin you cannot live with, change the price, the scope or the clause that passes on wage costs, not the assumptions that produced the problem. Good Loux, which publishes this Journal, also offers a free commercial cleaning bid calculator that works from the same inputs. It is a faster check than this worksheet, and the two differ in structure: the calculator takes overhead and profit as shares of the price and starts from a 30 percent labor burden, while the worksheet builds the burden from its parts and allocates overhead per hour. The calculator's own page says its starting values are illustrative and that a walkthrough is what turns an estimate into a quote.

Next steps

Before the next bid, do four things. Time a crew on three or four real visits and record a production rate for each building type you serve. Ask your agent and your accountant for the actual workers' compensation and unemployment rates so that the burden rows contain quotes. Work out your overhead per billable hour from last quarter's books and update it as the hour count grows. Then run your next walkthrough through the worksheet and keep the completed copy with the proposal, so that when the account renews you can compare the estimate with what the work really took.

Pricing a job well does nothing without buildings to price. Our guide to how to find the person who hires cleaning companies covers where those conversations begin, and the article on profit margins and cash flow follows a price into the bank account.

Sources

We read these pages directly on November 5, 2026. Pages change, so check the originals. BSCAI is a trade association whose articles are industry guidance, not law. Nothing here is legal, tax or insurance advice, and wage, tax and employment rules vary by state and city.

The worked examples, the worksheet, the time-trial method and the judgments marked as ours are not research findings. Nobody was interviewed, no figure here is an industry average, and no source cited publishes a rate card. State unemployment and workers' compensation rates were not researched and appear only as labeled assumptions.